
Pebble
Gold Copper Project: Draft Environmental Baseline Studies
Index
of Pebble Gold Copper Environmental Study Maps
Note:
Some of these Adobe Acrobat PDF files are extremely large. (To download,
PC Users can
Right Click on the link and "Save Target As").
1-1 Project
Location (41.2 MB)
1-2 Project
Activity Flow (283K)
1-3 Integration
of Engineering and Environmental Activities (57K)
1-4 Historicial
Cominco Sampling Stations (1.2MB)
1-5 Baseline
Study Area (11.5MB)
1-6 Preliminary
Access Routes (820K)
2-1 Meterological
Monitoring Stations (9.6MB)
4-1 Surface
Water Monitoring Stations (Mine): (13.7MB)
4-2 Snow
Survey (646K)
4-3
Surface Water Monitoring Stations (4.8 MB)
5-1 Hydrogeology
Drill Holes (12.7 MB)
7-1 Boundary
of Naturally Occurring Constituents in Surface Soil, Sediment
(9.5MB)
7-2 Sampled
Sections of Naturally Occurring Constituents in Surface Soil, Sediment,
Vegetation and Fish (Mine) (15 MB)
7-3 Naturally
Occurring Constituents in Surface Soil, Sediment, Vegetation and
Fish (Road & Port) (71 MB)
8-3 Existing
Drill Holes (545K)
9-1 Mammal
Surveys (Mine): 840K
9-2 Raptor
Surveys (2.6MB)
9-3 Waterfowl
Surveys (2.6MB)
9-4 Wildlife
Habitat Mapping Breeding Birds (Mine): (840K)
10-1 Wetlands
Mine (2MB)
11-1 Aquatic
Monitoring Stations Mine (2.8MB)
12-1 Marine
Bird Surveys Port (973K)
13-1 Subsistence
Tiers (2.3MB)
|
|
| BBNA's
Natural Resources Program protects
the right of Bristol Bay villages to choose how
to continue to meet their subsistence, cultural and economic
needs. Consistent with solid stewardship, sustainability and
self-reliance,the program helps advance our villages'
natural resource management goals. |
|